Sigma AI Changelog
8 appeared, 2 closed over the past 14 days. Reconstructed from SignalGigs scrape history, last checked .
2026-11-04 — 1 event
- 15:40appearedCzech & English Linguistic Projects (Remote)· annotation
2026-10-31 — 2 events
- 20:10appearedSerbian Linguistic Projects (On-site London)· annotation
- 20:10appearedSlovak Linguistic Projects (On-site London)· annotation
2026-10-29 — 1 event
- 12:19closedSwedish Linguistic Projects (On-site London)· annotation
2026-10-27 — 1 event
- 17:44appearedSwedish Linguistic Projects (On-site London)· annotation
2026-10-24 — 1 event
- 12:18closedChinese (Hong Kong) Linguistic Projects (Remote)· annotation
2026-10-23 — 4 events
- 09:23appeared
- 09:23appearedMalayalam & English Linguistic Projects (Remote)· annotation
- 09:23appeared
- 09:23appeared